News & Views

Ørsted – What installed capacity alone doesn’t tell you about Britain’s wind & solar

Analysis

If you just look at installed capacity for Britain’s wind & solar power you can explain growth, but not why the same offshore fleet delivers merely half its capacity in November and only a fifth in July 2025.

Table of content

Britain had to turn down about 10 TWh of wind power in 2025, on top of the 86 TWh its wind farms produced. Installed capacity, the figure that most people would intuitively quote for wind and solar energy production, doesn’t show that. What else does it miss?

This is the second piece in our series on the finalists of the 2026 Earthshot Prize, the global environmental prize founded by Prince William. In each piece we take public data and see how much a good analysis framework can tell us (read Analysis 1: Satellites on fire). This one starts with Ørsted, which builds and runs offshore wind farms, including several off the British coast.

Looking at Ørsted’s work led us to a bigger question: how does Britain’s renewable generation change through the year, and how much of that can installed capacity explain? By installed capacity, we mean the most a wind or solar farm can produce when it’s running flat out.

We compared offshore wind, onshore wind and solar month by month from January 2024 to September 2026. We used half-hourly data from Elexon, NESO and Sheffield Solar, and official capacity figures from DESNZ. We set what each fleet produced against what was installed at the time, then zoomed in on Hornsea 2, one of Ørsted’s farms, to see the same pattern at the scale of a single site.

 

In short

What the data explains

  • Installed capacity explains the long-run growth in output, but almost none of how it is shaped through the year.
  • The same offshore fleet delivers about half of its capacity in November and about a fifth in July. Solar runs from 17% in June to 2% in December.
  • Wind farms are also switched down when the grid can’t carry their power. In 2025, GB wind farms generated about 86 TWh and about 10 TWh more had to be curtailed, almost all of it in Scotland, and most of it in the windiest hours.

What needs further investigation

  • How quickly new farms reach full output after they’re counted as installed.
  • An unexplained change in one of the main public data feeds in spring 2026.
  • Whether curtailment before 2024 was lower, and how fast it’s rising.

The first look

The number everyone turns to first is capacity. At mid 2026 the UK had about 17 GW (gigawatt) of offshore wind, 17 GW of onshore wind and 22 GW of solar.

As a reminder on units: a gigawatt is how much power a fleet can produce at any moment when running flat out; and a terawatt-hour is the amount of energy produced over time. E.g. 1 GW running flat out over a year makes about 8.8 TWh.

Installed capacity (dashed) rises slowly; monthly average output swings with the seasons.
Installed capacity (dashed) rises slowly; monthly average output swings with the seasons.

Those figures move slowly. Between early 2024 and mid 2026, offshore capacity grew 13%, onshore 8% and solar 25%. Monthly output, set against the same capacity, does not move slowly at all.

Why it misleads

A gigawatt of capacity is the ceiling and there are three drivers that might mean that you don’t hit it.

Wind varies

An average November produces 6.0 TWh from offshore wind; an average July, 2.5 TWh. Same farms, same turbines, but less than half the output. Weather years matter too: on DESNZ’s (Department for Energy Security and Net Zero) 2015–2025 record, 2024 and 2025 were two of the three weakest years for offshore wind. The seasonal swings in this piece were measured in a quiet period, so if anything they understate a typical one.

Farms are paid to cut output

When the grid can’t carry the power, the system operator instructs wind farms to cut output. In 2025, about 10 TWh of GB wind was turned down this way. In the worst month of our window (September 2026), it took out 8% of wind capacity. 98% of it was at Scottish farms, which hold under half of the wind capacity involved. The Renewable Energy Foundation, which tracks these payments back to 2010, puts 2024 at 8.3 TWh, 98% of it Scottish, in line with our 8.4 TWh. DESNZ’s regional figures point the same way: in 2024, offshore wind ran at 40% of capacity in England against 35% in Scotland, with curtailment one of the reasons.

Wind turned down each month, GB. Almost all of it is in Scotland.
Wind turned down each month, GB. Almost all of it is in Scotland.

We expected curtailment to be highest when Britain had more power than it needed. It wasn’t. We sorted every half-hour by how much wind Britain was generating. When wind output was at its highest, above about 14 GW, three times as much Scottish wind was being turned down as at average wind levels. Half of all the curtailment happened in the windiest fifth of the time. This held in every month, so it isn’t just a winter effect. And during those hours, gas plants across GB were still running at 6.4 GW on average, and Britain was importing power for 99% of the curtailed energy.

The windier it is, the more Scottish wind gets turned down.
The windier it is, the more Scottish wind gets turned down.

The wind was there; the transmission links south weren’t big enough to carry it, and lines being out of service for maintenance make it worse, as the UK Energy Research Centre has noted. That fits what grid analysts such as Modo Energy and Montel EnAppSys have described: bottlenecks between northern Scotland and England, with gas further south turned up to replace the lost wind. The half-hourly data shows how closely the two track each other.

New farms ramp up

Offshore capacity doesn’t grow smoothly. Almost half of the offshore growth in our window arrived in a single quarter, as new farms were connected. A farm can appear in the capacity figures before all its turbines are generating, so part of any month’s gap between capacity and output may be commissioning. Our data can’t separate that from weather, and it’s on the list for further work.

The split: offshore, onshore and solar by month

Divide each month’s output by the capacity installed that month and you get the load factor: the share of its maximum the fleet actually produced.

Highest month Lowest month Gap
Offshore wind 50% (November) 20% (July) 30 pts
Onshore wind 32% (December) 15% (July) 18 pts
Solar 17% (June) 2% (December) 15 pts

DESNZ’s official quarterly load factors show the same pattern, as do Aurora Energy Research’s monthly market summaries, and our quarterly figures sit within two points of DESNZ’s.

Load factor by calendar month: wind peaks in late autumn and winter, solar in early summer.
Load factor by calendar month: wind peaks in late autumn and winter, solar in early summer.

Over a year, wind and sun take turns: windy winters, sunny summers. But that doesn’t mean a calm day is likely to be a sunny one. Comparing days within the same month, windy days and sunny days are barely related, so a still, grey day can happen at any time of year. A Met Office study of decades of weather data found the same: wind and solar are only weakly opposed day to day. Days with both low wind and low sun are rare, though: Ember estimates that only about 2% of days in a typical year have both low wind and low sun (via Carbon Brief).

Our early exploration of the data suggested two patterns. Testing them against the full record gave mixed results:

  • Wind droughts cluster in July and November. July holds: it accounts for about 16% of the lowest-wind days, in every year. November doesn’t: all of its low-wind days came from two calm spells in early November 2024.
  • Solar’s share peaks in summer and was higher in 2026 than 2025. Both hold, but the 2026 rise is about 4 to 5 percentage points, smaller than the first look suggested. Part of the apparent jump came from a change in one data feed (section 6).

A test case: one farm, one winter month, one summer month

To see the seasons at the scale of a single farm, we took Hornsea 2, the Ørsted-operated farm off the Yorkshire coast: three units of 440 MW, 1,320 MW in total. We looked at its metered output in January and July 2025.

January 2025 July 2025
Average output 701 MW 305 MW
Share of capacity 53% 23%
Half-hours above 90% of capacity 31% 2%
Half-hours below 10% of capacity 15% 43%
Peak output ~1,308 MW ~1,307 MW

The farm reached full output in both months. What changed was how often. In January, almost a third of half-hours ran close to full output; in July, 43% ran below a tenth of it.

Share of half-hours at each output level, January vs July 2025.
Share of half-hours at each output level, January vs July 2025.

January 2025 was a relatively calm winter month for British offshore wind as a whole (a fleet-wide load factor of 36%, against 42–51% in the other winter months we looked at). In a typical winter the gap between the two months would probably be wider.

Capacity: why we used a rolling monthly estimate

This is where installed capacity stops being the answer and becomes part of the method.

The fleets grew over the period. In January 2024, installed solar was about 70% of what it was by September 2026, and wind about 90%. If you divide every month’s output by today’s capacity, a fixed nameplate, the early months look worse than they were, and the trend looks better than it is.

Take June solar. Against a fixed nameplate, output per installed megawatt appears to rise by 3.6 points between June 2024 and June 2026. Against the capacity actually installed each June, it fell slightly (by 0.6 points). All of the apparent improvement was the fleet getting bigger. Across 2024 as a whole, a fixed nameplate would put solar’s load factor at 6.7% when it was really about 9%.

Monthly load factor against the capacity installed that month (solid) and against a fixed nameplate (dashed).
Monthly load factor against the capacity installed that month (solid) and against a fixed nameplate (dashed).

So we measured each month against an estimate of what was installed that month: DESNZ’s quarterly wind capacity spread across the months in between, and Sheffield Solar’s monthly estimate for solar. Measured that way, about three-quarters of the rise in solar’s summer peaks since 2024 is new panels. The rest is recovery from a dull 2024, helped by the sunniest spring on record in 2025.

Where the data ends

All of this rests on public data, and it has limits.

  • GB totals by type. The only half-hourly split between offshore and onshore wind comes from one Elexon feed. Between 27 March and 20 November 2024, that feed under-reported offshore wind: in the third quarter of 2024 it captured 16% of the offshore generation DESNZ recorded. Others have flagged problems with public wind data before: Electric Insights notes that Elexon’s metered data covers only part of the wind fleet, and Gordon Hughes found Elexon and NESO disagreeing on the offshore/onshore split. We found no public notice of this fault. We used NESO’s total wind and DESNZ’s quarterly figures for 2024 instead, which means the calendar-month figures for October and November rest on 2025 alone.
Elexon vs NESO wind output, with the 2024 reporting fault shaded.
Elexon vs NESO wind output, with the 2024 reporting fault shaded.
  • An unexplained change in 2026. From late April 2026, the same feed’s wind figures fell about 5% relative to NESO’s, and its solar figures rose about 7% relative to Sheffield Solar’s. Neither reference source moved, and we found no public notice explaining it. The summer 2026 offshore/onshore split should be treated as provisional.
  • Gaps in the feed. 16% of May 2026 and 32% of June 2026 half-hours are missing, so monthly figures use averages, not totals.
  • Duplicate rows we cleaned. For about seven weeks in March and April 2026, most half-hours were published twice: a placeholder row first, then the real figure about two hours later. Keeping the first version would have wiped out seven weeks of wind. We kept the latest.
  • Capacity is estimated. DESNZ publishes capacity quarterly, and the latest quarter is provisional; the monthly values in between are our interpolation. DESNZ covers the UK, while Elexon, NESO and Sheffield Solar cover Great Britain.
  • Curtailment is a lower bound. It covers wind farms in the Balancing Mechanism only, not smaller farms connected to local networks. The bottleneck reading is indirect: it shows gas and imports were running while wind was turned down, not that they were increased to replace it.

What needs further investigation

  • How long new offshore farms take to reach full output once they’re counted as installed.
  • What changed in the Elexon feed in spring 2026.
  • Curtailment before 2024, to see how fast the 8–10 TWh a year is growing.
  • Which offshore farm the 2024 subsea export cable fault, mentioned by DESNZ, affected, and how much of 2024’s weak offshore year it explains.
  • DESNZ’s figures for the third quarter of 2026, which will settle the summer 2026 solar share on an independent source.

What this means

Installed capacity is what people are always talking about, and it does explain the amount of renewable power Britain can make each year. It does not explain however when that power arrives, how much of it the grid can take, or whether this year’s numbers are better than last year’s. For that, you have to measure output against what was actually installed at the time, month by month, and know where your data stops being reliable. And that’s exactly why it pays off to look beyond just a single number.

How we did this

Window: January 2024 to September 2026, half-hourly. Load factor is monthly average output divided by the capacity installed that month. Wind capacity is DESNZ’s quarterly UK figure, interpolated to months; solar capacity is Sheffield Solar’s GB estimate. Curtailment is wind turned down through accepted bids in the Balancing Mechanism. Farms were assigned to Scotland by grid location and DESNZ’s Renewable Energy Planning Database; on coordinates alone, at least 82% of curtailment is certainly Scottish. Low-wind days are the lowest 10% of days by total GB wind output relative to installed wind capacity. The Hornsea 2 figures are Elexon metered output for two months only. Every headline figure was checked against a second, independent source, and every query was re-run from the saved data before publication.

Read the rest of the series and how we work with The Earthshot Prize

Written by Tommy BassettPublish date: 16.11.2026Updated on: 23.11.2026

More news & views

Keep reading about the latest from us

AirQo – Air quality measurements are not equally distributed
Analysis
10 MIN READ
Satellites on Fire – Counting Fires is not the Same as Measuring Them
Analysis
10 MIN READ
Confidently Wrong – Why You Need Context Governance
AIData models
8 MIN READ
Steep Just Got a Lot More Powerful — Here’s What’s Changed
BI
5 MIN READ